The focal point for managing the operational aspects in the substance managing system, QC Navigator gives the crucial link in between the non-real time host and the real-time Programmable Logic Controller (PLC) based material handling system. It coordinates the numerous real-time control units to accomplish the every day workload. At each selection place, QC Navigator determines essentially [...]
Archive for July 31st, 2010
How can I commence a MATLAB code with an input from PLC?
July 31st, 2010 by admin
I want to begin Image Acquisition in MATLAB when the objects passes through. So I m going to make use of a plc for that relationship between the optical sensor and matlab. I just want the matlab code to start executing when the object passes with the optical sensor, the output will arrive from a wago plc.



Posted in